Dimensions, navigation parameters, operational capacity and financial projections — the hard numbers behind Nova Holanda South Atlantic Decom.
Simultaneous PSV / LNH berthings
Afloat decommissionings — 70,000 t (A) + 45,000 t (B)
Simultaneous PANAMAX berths (~230k TEU/yr)
Process modules built simultaneously
Equipment and drilling column certifications
Investment fully recovered after the start of dismantling two FPSO platforms simultaneously — a demand considered high and continuous for the coming decades.
After Installation License — no lengthy concrete foundation work, just rapid rock-mass cutting.